Construction Company in DHA Bahawalpur

Projects appear here only when the office marks them for the website. A project's own contract amount is not listed. Progress is the share of work recorded on each project.

Grey structure: Rs 3,000/sq ft. Finishing: Rs 6,000/sq ft.

Choose Single Storey or Double Storey. Double Storey is selected to start, and covered area is the plot in square feet times that storey factor. A 5 marla double-storey house is 2,250 sq ft (grey structure about 67.5 lakh, with finishing about 1.35 crore). A 10 marla double-storey house is 4,500 sq ft (grey structure about 1.35 crore, with finishing about 2.7 crore). Typing a covered area uses that figure instead. Estimate based on current per sq ft rates; final quotation after site visit and design.

Construction by plot size

Each size has its own guide to layout, stages and the DHA drawing step. Published grey-structure and finishing rates are on this page and the calculator.

Talk to the office

An enquiry is saved as a website lead with interest Construction. Grey structure: Rs 3,000/sq ft. Finishing: Rs 6,000/sq ft. Estimate based on current per sq ft rates; final quotation after site visit and design.

Construction enquiry

Construction rates

What is the grey structure construction rate?
Grey structure: Rs 3,000/sq ft. The calculator multiplies covered area by that rate.
What does with finishing include?
Finishing: Rs 6,000/sq ft. That is the complete rate, grey structure plus finishing, not an extra on top of grey structure.
How do single and double storey change the estimate?
Choose Single Storey or Double Storey. Double Storey is selected to start. Covered area is the plot in square feet times the storey factor (1 for a single storey and 2 for a double storey, unless the office has changed those factors). A 5 marla double-storey house is 2,250 sq ft, about 67.5 lakh for grey structure and 1.35 crore with finishing. A 10 marla double-storey house is 4,500 sq ft, about 1.35 crore for grey structure and 2.7 crore with finishing. If you type a covered area, that figure is used and the storey choice is not.
Is the construction calculator a final quotation?
Estimate based on current per sq ft rates; final quotation after site visit and design.